
Dr. Mukesh Kirar
Associate Professor
Google Scholar: https://scholar.google.com/citations?user=7HLp4Q4AAAAJ&hl=en
Scopus: https://www.scopus.com/authid/detail.uri?authorId=58987921600
ORCID: https://orcid.org/0000-0002-8486-2550
Vidwan: https://vidwan.inflibnet.ac.in/profile/61673
|
U.G. |
EMEC-III |
|
EMEC-II |
|
|
Power System Protection and Fault analysis |
|
|
Basic Electrical and Electronics Engineering |
|
|
P.G. |
Advanced Power System Protection |
|
Power System Stability and Control |
|
|
Power System Analysis |
|
|
Microgrid Analysis |
|
Organization |
Start Date |
End Date |
Designation |
Nature of Work |
| Indian OilTanking Design and Engineering | Aug 2008 | 25.05.2010 | Design Engineer | Design and analysis of industrial power system |
|
MANIT, Bhopal |
26 May 2010 |
01 Nov 2014 |
Assistant Professor |
Teaching and Research |
|
MANIT, Bhopal |
02 Nov 2014 |
28 Dec 2018 |
Assistant Professor-II |
Teaching and Research |
|
MANIT, Bhopal |
29 Dec 2018 |
23 Dec 2024 |
Assistant Professor-I |
Teaching and Research |
| MANIT, Bhopal | 24 Dec 2024 | Till Date | Associate Professor |
Teaching and Research |
|
Name of the Student |
Topic |
Year of Award |
Co-Supervisor (if any) |
|
Shiwani Rai |
Grid Integrated Solar Energy Conversion System to Improve Power Quality |
2021 |
Dr. Y. Kumar |
|
Sumeet Wankhede |
Planning and Control of Distributed Energy Resources in Smart Grid Network |
2023 (Submitted) |
Dr. Priyanka Paliwal |
|
Lokesh Chhadokar |
Multi-Objective Optimal Charging Scheduling for EV Integration in Distribution Systems |
On-going |
---- |
|
Gautam Yadav |
Design and Analysis of Protection Technique for Microgrid |
On-going |
Dr. S. C. Gupta |
| Rahul Kumar |
Microgrid Control |
On-going | |
| Ritesh Kumar Jha | Energy Management in Microgrid |
On-going |
|
Title |
Sponsoring Agency |
Duration |
Amount |
Co-PI (if any) |
Status |
|
Efficiency and Failure analysis of Distribution Transformer |
MANIT-MHRD | 12 Months | 22.9 Lakhs | Co-PI | Completed |
| Estimation of Technical Losses in Distribution Network of MPMKVVCL Bhopal | MPMKVVCL Bhopal | 1.5 Years | 13.5 Lakhs | PI | Completed |
| Assessing Strategies for Cost-Effective Integration of PM-KUSUM Plants with the Distribution Grid | Council on Energy, Environment and Water | 2 Years | 30.77 Lakhs | Co-PI | On-going |
|
Title |
Sponsoring Agency |
Duration |
Amount |
Co-Investigator (if any) |
|
Studies to facilitate scaling up of KUSUM scheme in Madhya Pradesh |
RUMSL, Madhya Pradesh |
Completed |
29,57,867/- |
Yes |
|
Studies for managing reactive power. |
RUMSL, Madhya Pradesh |
Completed |
48,38,000/- |
Yes |
|
Implementation of pilot project at Raipura, Madhya Pradesh |
GIZ Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
|
On-going |
8,26,000/- |
Yes |
|
Approval/Verification of Electrical Design & Drawing of 92.5 MLD STP |
Eco Protection Engineers Pvt. Ltd. |
Completed |
175000/- |
Yes |
|
Approval/Verification of Electrical Design & Drawing of 92.5 MLD STP (Upgradation) |
Eco Protection Engineers Pvt. Ltd. |
Completed |
50000/- |
Yes |
|
Vetting of Design and Drawing of 1600kVA, 630 kVA and 315 kVA, Transformer of Chhatarpur Water Supply Project under AMRUT |
Concrete Udyog Limited |
Completed |
50000/- |
Yes |
|
CPWD Bhopal |
Third Party Inspection of income tax building |
Completed |
1200000/- |
Yes |
|
Vetting of Electrical Design and Drawing of Majholi, Siddhi |
JIFT Water Infrastructure Ltd. Delhi |
Completed |
250000/- |
Yes |
|
Vetting of electrical Design and Drawing of Manpur Umaria |
Water Infrastructure Ltd Delhi |
Completed |
250000/- |
Yes |
|
Vetting proof of mechanical design drawing of intermediate pumping station and sewage treatment plant of Hoshangabad |
Consulting Engineering forum |
Completed |
350000/- |
Yes |
|
Vetting/Approval of Electrical Load List For Bansagar |
WPIL Ltd. Kolkata |
Completed |
175000/- |
Yes |
|
Vetting of Electrical Design and Drawing of Electrical substation Bineta Sehor |
Water Infrastructure Ltd Delhi |
Completed |
150000/- |
Yes |
|
Vetting of SLD and Switch yard layout for intake well & WTP area Detehra |
IELM JV Pvt. Ltd Gurgaon |
Completed |
100000/- |
Yes |
|
Vetting of drawing and design of PLC system architecture for chhatarpur water supply scheme |
Concrete Udyog Ltd. |
Completed |
50000/- |
Yes |
|
Vetting of Electrical Components of 65 MLD STP Gwalior |
Sahaj/Jayantisuper Construction Pvt. Ltd. |
Completed |
50000/- |
Yes |
|
Approval/verification of electrical design and drawing of 92.5 MLD STP |
Eco Protection Engineers Pvt. Ltd |
Completed |
50000/- |
Yes |
|
Vetting of grid connected ground mounted solar power project |
Heliosvento Power Infra Pvt. Ltd |
Completed |
60000/- |
Yes |
|
Vetting of work of water distribution system, associated pump house, SCADA and Electrical works of Indrasagar-1 multi Village Scheme |
AFCONS Infrastructure LTD, House No. 3378, Infront of Grand Lodge, Anad Nagar Colony, Khandwa Madhya Pradesh-450001 |
On-going |
300000/- |
Yes |
|
Vetting of Electrical Design & Drawing of WTP projects |
Enviro Infra Engineers Limited |
Completed |
500000 |
Yes |
|
Vetting of Eletro-mechanical Items and work for power plant component of Raghavpur Multi Purpose Project. |
Afcons Infrastructure Limited |
On-going |
850000 |
Yes |
|
Vetting of Electro-Mechanical Drawings and calculations Jabalpur MVS. |
Afcons Infrastructure Limited |
On-going |
150000 |
Yes |
|
Vetting of work of water distribution system, associated pump house, SCADA and Electrical works of Indrasagar-1 multi Village Scheme |
Afcons Infrastructure |
On-going |
300000 |
Yes |
|
Vetting of Electrical Design & Drawing and instrumentation design of Khategaon Kannod MVS |
Blue Star-Hindustan Project JV, |
On-going |
190000 |
Yes |
|
Vetting of electro mechanical design and drawing of 132 kV, 25 MW hydro power plant |
RVR Project Pvt Ltd |
On-going |
400000 |
Yes |
|
Vetting of Design, calculation & Drawing of Electrical system and Mechanical GAD for Gandhisagar-1 MVWSS, District Mandsaur & Ratlam |
LCC Project PVT LTD. |
On-going |
500000 |
Yes |
|
Authors |
Title |
Journal |
VOL. NO., PAGE NO |
YEAR |
SCI/ Scopus |
IMPACT FACTOR |
|
Yadav, Goutam Kumar, Mukesh Kumar Kirar, S. C. Gupta, and Jatoth Rajender |
Integrating ANN and ANFIS for effective fault detection and location in modern power grid |
Science and Technology for Energy Transition |
80 (2025): 34 |
2025 |
SCI |
2.22 |
|
Yadav, Goutam Kumar, Mukesh Kumar Kirar, and S. C. Gupta |
Microgrids protection: A review of technologies, challenges, and future trends |
Renewable Energy Focus |
(2025): 100720 |
2025 |
Scopus |
7.81 |
|
Jaraniya, Dulichand, Shailendra Kumar, and Mukesh Kumar Kirar |
LMSTDE Control for Hybrid Charging Station With Ancillary Services Powered by Variable Speed Wind and PV Array Based Renewable Energy Resources |
IEEE Transactions on Industrial Informatics (2024). |
|
2024 |
SCI |
13.3 |
|
Mukesh Kumar Kirar |
RegPSO-ANN-Based Optimum Adaptive Load Shedding Technique |
Arabian Journal for Science and Engineering |
2191-4281 |
2023 |
SCI |
2.7 |
|
Wankhede, Sumeet Kumar, Priyanka Paliwal, and Mukesh K. Kirar |
Increasing penetration of DERs in smart grid framework: a state-of-theart review on challenges, mitigation techniques and role of smart inverters |
Journal of circuits, systems and computers |
29, 1793-6454 |
2020 |
SCI |
1.5 |
|
Vishnoi, Shreya, Srete Nikolovski, More Raju, Mukesh Kumar Kirar, Ankur Singh Rana, and Pawan Kumar |
Frequency Stabilization in an Interconnected Micro-Grid Using Smell Agent Optimization AlgorithmTuned Classical Controllers Considering Electric Vehicles and Wind Turbines |
Energies |
16 no 6, 2913-2023 |
2023 |
SCI |
3 |
|
Mukesh Kumar Kirar |
IoT Based Remote Monitoring, Control, and Protection of Irrigation Water Pumping System |
Journal of Operation and Automation in Power Engineering |
11, 2423-4567 |
2023 |
Scopus |
1.6 |
|
Laxman Solankee, Dr. Avinash Rai and Dr. Mukesh Kirar |
High Impedance Fault Detection in Microgrid to Enhance Resiliency Against PMU Outage |
International Journal of Computing and Digital Systems |
1-9 |
2023 |
Scopus |
0.23 |
|
Sumeet Kumar Wankhede; Priyanka Paliwal; Mukesh K. Kirar |
Bi-Level Multi-Objective Planning Model of Solar PV-Battery Storage-Based DERs in Smart Grid Distribution System |
IEEE Access |
vol. 10, pp. 14897-14913 |
2022 |
SCI |
3.47 |
|
M. Kumar, T. Maity and M. K. Kirar, |
Energy Savings Through VOD (Ventilation-on-Demand) Analysis in Indian Underground Coal Mine |
IEEE Access |
vol. 10, pp. 93525-93533 |
2022 |
SCI |
3.47 |
|
Rai, Shiwani, Yogendra Kumar, and Mukesh Kirar. |
Technological advancements in grid integration of solar energy: a review. |
Suranaree Journal of Science & Technology |
28, no. 4 (2021): p1-11. |
2021 |
Scopus |
0.127 |
|
Chadokar, Lokesh, Mukesh Kumar Kirar, Goutam Kumar Yadav, Umair Ahmad Salaria, and Muhammad Sajjad |
Aggregation and Bidding Strategy of Virtual Power Plant |
Journal of Electrical Engineering & Technology |
20, no. 1 (2025): 199-216 |
2025 |
SCI |
|
|
Kumar, Manoj, Tanmoy Maity, and Mukesh Kumar Kirar |
Energy savings by optimizing the speed of the primary ventilation fans in Indian underground coal mines based on VOD and TOU tariffs |
Energy Efficiency |
17, no. 8 (2024): 105. |
2024 |
SCI |
4.54 |
|
Nallagalva, Swaroop Kumar, Mukesh Kumar Kirar, and Ganga Agnihotri |
Transient stability analysis of the IEEE 9-bus electric power system |
International Journal of Scientific Engineering and Technology |
1, no. 3 (2012): 161-166 |
2012 |
|
|
|
Kirar, Mukesh Kumar, Renuka Kamdar, Manoj Kumar, and Ganga Agihotri |
Load shedding design for an industrial cogeneration system |
Electrical and Electronics Engineering: An International Journal |
2, no. 2 (2013): 35-47 |
2013 |
|
|
|
Kirar, Mukesh Kumar, and Ganga Agnihotri |
Emergency Generator Sizing and Motor Starting Analysis |
International Journal of Electrical, Computer, Electronics and Communication Engineering |
7, no. 1 (2013). |
2013 |
|
|
|
Pothamsetty, Lakshminarayana, Shishir Ranjan, Mukesh Kumar Kirar, and Ganga Agnihotri |
Power system transient stability margin estimation using artificial neural networks |
Electrical and Electronic Engineering: An International Journal |
3, no. 4 (2014): 47-56 |
2014 |
|
|
|
Rai, Shiwani, Y. Kumar, and M. K. Kirar |
Multi-Level Inverter Topologies Based UPQC Applied to Distribution Systems for Power Quality Improvement |
International Journal of Recent Technology and Engineering |
8, no. 4 (2019): 5129-5135. |
2019 |
|
|
|
Kirar, Mukesh Kumar, and Ganga Agnihotri |
Transient Stability Enhancement by Ann Based Adaptive Load Shedding |
International Journal of Electrical Engineering & Technology |
3, no. 3 (2012): 200-210 |
2012 |
|
|
|
Rathore, Sourabh, Mukesh Kumar Kirar, and S. K. Bhardwaj |
Simulation of cascaded H-bridge multilevel inverter using PD, POD, APOD techniques |
Electrical & Computer Engineering: An International Journal |
4, no. 3 (2015): 27-41 |
2015 |
|
|
|
Title |
Year |
Agency |
Co-Investigator(if any) |
Published/Granted |
|
Apparatus for Generating High Frequency Magnetic Field to test Magnetic Field Interference on Electric Devices |
2023 |
Controller General of Patents and Trade Marks Government of India |
Krishnav Bhatiya |
Granted |
|
Surge Protection Earthing Arrangement |
2023 |
Controller General of Patents and Trade Marks Government of India |
Krishnav Bhatiya |
Granted |
